Wednesday, July 23, 2008

Previously the studio had 2 bare bulbs hanging from the ceiling . . .


DSC03609, originally uploaded by robisonpdx.

now I have 8 can lights on a dimmer. :)

The new studio wall.


DSC03605, originally uploaded by robisonpdx.

This will ultimately be painted and trimmed out to look like the other garage door.

More front porch demo


DSC03604, originally uploaded by robisonpdx.

Tuesday, July 22, 2008

Lumber and footings for the back porch!


DSC03603, originally uploaded by robisonpdx.

New windows in the studio.


DSC03602, originally uploaded by robisonpdx.

2 single pane aluminum windows (only one opened) turn into 3 properly installed and opening vinyl windows.

The roof demo has begun.


DSC03600, originally uploaded by robisonpdx.

The roof will be demo'd on the end and extended to the north edge of the patio. We will then get a new roof surface.

New Ply on the patio.


DSC03599, originally uploaded by robisonpdx.

Sunday, July 20, 2008

Brand new view . . .


DSC03597, originally uploaded by robisonpdx.

and access into the back yard!


DSC03596, originally uploaded by robisonpdx.

Slider and two basement windows


DSC03595, originally uploaded by robisonpdx.

The new slider!


DSC03594, originally uploaded by robisonpdx.

Porch to come soon.

Really giant window is still in the driveway


DSC03593, originally uploaded by robisonpdx.

leaning against the dumpster.

1 of the two concrete footings


DSC03592, originally uploaded by robisonpdx.

for the front porch posts.

New Beams


DSC03590, originally uploaded by robisonpdx.

I suspect that the new beefier beams are where the fireplace will sit.

2 of the three windows have been replaced . . .


DSC03589, originally uploaded by robisonpdx.

in support of the new slider and back porch that will go in the middle bedroom upstairs.

New windows in the basement


DSC03588, originally uploaded by robisonpdx.

Smaller, but better insulation and security. The previous windows were just up against the concrete. We end up with properly framed windows. We will still get some light, and ventilation but we didn't really rely much on these windows anyway.

Thursday, July 17, 2008

Big Giant Window made it out of the truck.


DSC03566, originally uploaded by robisonpdx.

Not sure what the next step is.

Noe attacks the concrete with the wrecker bar.


DSC03565, originally uploaded by robisonpdx.

Cutting Concrete for footings for the new front stairs.


DSC03564, originally uploaded by robisonpdx.

Frosty glass for the bathroom.


DSC03562, originally uploaded by robisonpdx.

Windows Windows everywhere!


DSC03561, originally uploaded by robisonpdx.

Where there was once a garage door . . .


DSC03560, originally uploaded by robisonpdx.

there will be a wall. Much to my surprise I walked into the garage (expecting to be able to exit to the street) and found a wall. Here they had it open temporarily to load in the windows.

The slider for the back yard.


DSC03559, originally uploaded by robisonpdx.

This door will be added to one of the upstairs bedrooms for essential mid-house entry into the back yard.

We have only been able to get to the yard from the north end and that makes us under utilize the whole back yard which is really quite nice. The hot tub will be installed down the yard to the left.

The Windows are here!!!


DSC03558, originally uploaded by robisonpdx.

That is our big window for the living room. It will replace a GIANT single pane of glass. That window in the picture weighs 270 pounds and will take at least 4 guys to get into place upstairs.

We are excited, even tough it is hard to beat the viewing properties through the current giant pane'o glass, the new window will give us important insulating properties for sound and climate, as well as the ability to pen it and get a breeze in the living room in the spring and summer.

No railings make for a free and clear view.


DSC03556, originally uploaded by robisonpdx.

That is where the stairs used to be connected to the house.


DSC03554, originally uploaded by robisonpdx.

This window . . .


DSC03553, originally uploaded by robisonpdx.

is to my office/temporary studio. The stairs were right in front of the window and you could only open the casements a couple inches because the stairs were in the way. We will now be able to have a better view and ventilation in there.

No front stairs . . .


DSC03552, originally uploaded by robisonpdx.

The support poles (steel rebar surrounded by rickety cosmetic tubing . . . classy!!) are going to be cut out.

Snuffleupagus the Japanese Maple has to go . . .


DSC03549, originally uploaded by robisonpdx.

the new front stairs will be coming down very near where he lives. Look for him on Craigslist.

The front demo begins


DSC03547, originally uploaded by robisonpdx.

The tear-off of the front stairs and demo of the balcony begins. Most of the existing joists are in good shape.

Bo, the Thinker


DSC03546, originally uploaded by robisonpdx.

Bo our site manager, foreman, jack of all trades and all around great guy keeping things in order.

The Cantilever


DSC03545, originally uploaded by robisonpdx.

We will have 24" of cantilever beyond the concrete wall.

Studs and joists + a new dumpster!


DSC03544, originally uploaded by robisonpdx.

Now the window openings will fit a proper window


DSC03543, originally uploaded by robisonpdx.

reverse window trimming


DSC03542, originally uploaded by robisonpdx.

Noe uses a hammer and a chisel to properly size the window openings in the concrete wall.

More headroom


DSC03541, originally uploaded by robisonpdx.

I get 3 - 4" of new headroom in the studio! Also the AC piping, and electrical conduit will be tucked nicely up inside the ceiling.

All new joists


DSC03540, originally uploaded by robisonpdx.

Brand new pressure treated lumber, perfectly graded to provide adequate "runoff" of water. Key step in the waterproofing of the new patio.

Saturday, July 12, 2008

Time to begin the healing process. :)


DSC03537, originally uploaded by robisonpdx.

Pretty much finished with the demo . . .


DSC03538, originally uploaded by robisonpdx.

All gone!


DSC03539, originally uploaded by robisonpdx.

All the tile, concrete, flooring and beams . . . gone.

My studio is looking grim


DSC03526, originally uploaded by robisonpdx.

Watch that first step


DSC03524, originally uploaded by robisonpdx.

It's a doosey!

Down to the semi-rotten beams


DSC03522, originally uploaded by robisonpdx.

All clean


DSC03520, originally uploaded by robisonpdx.

Terra Cotta tiles all gone, down to the bare rotten subfloor.

Surprise. Rotten Wood!


DSC03518, originally uploaded by robisonpdx.

The start of the whole thing was a leaking patio . . . when it rained water leaked into the garage (used as a recording studio) below. We guessed that it had been leaking for a while, but it looks like it has been leaking for many years., well before we purchased the house.

Down comes the classy aluminum patio roof.


DSC03514, originally uploaded by robisonpdx.

The dumpster! So it begins!


DSC03511, originally uploaded by robisonpdx.

Arrived at 6:50 am on the first day. Our life is so going to change for a while.

Wednesday, July 9, 2008

Before: Patio looking east.


DSC03490, originally uploaded by robisonpdx.

Fancy aluminum cover, terracotta tiles, wrought Iron railings. Classy!

The Before picture . . .


DSC03498, originally uploaded by robisonpdx.

From the front of the house the day before the dumpster arrived. The roofline, patio and front stairs will look very different in 90 days or so.

Friday, July 4, 2008

Drawings of the outcome


East Elevation, originally uploaded by robisonpdx.

This drawing shows the new roof profile, covering the entire patio, the new outdoor fireplace, the new porch and entry stairs.