skip to main | skip to sidebar

Mt. Tabor Remodel

Saturday, September 13, 2008

They are still working on the kitchen area . . .


DSC03805, originally uploaded by robisonpdx.

but the doors are in, the sink is in and the spaces are there for the grill and side burners. From right to left:
Space for refrigerator, Grill, Side burner, and on the left end the sink.

Posted by Juniorrocker at 9:29 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (146)
    • ►  11/02 - 11/09 (1)
    • ►  10/26 - 11/02 (5)
    • ►  10/19 - 10/26 (2)
    • ►  10/12 - 10/19 (2)
    • ►  09/28 - 10/05 (5)
    • ▼  09/07 - 09/14 (19)
      • The fireplace is supposed to go in today (Saturday)
      • Ceiling detail
      • A view from the north west side . . .
      • Our cool round undermount sink.
      • They are still working on the kitchen area . . .
      • More ceiling
      • Stone and tile guys have been working for a week ....
      • DSC03801, originally uploaded by robisonpdx.
      • DSC03800, originally uploaded by robisonpdx.
      • From the porch
      • Front Porch posts
      • The New Chimney!
      • A view from down the street
      • An updated front view.
      • Now that we are on the home stretch . . .
      • A close up of the surface
      • More waterproof flooring.
      • The surface . . .
      • Fireplace stone
    • ►  08/31 - 09/07 (6)
    • ►  08/17 - 08/24 (5)
    • ►  08/10 - 08/17 (12)
    • ►  08/03 - 08/10 (27)
    • ►  07/20 - 07/27 (27)
    • ►  07/13 - 07/20 (21)
    • ►  07/06 - 07/13 (12)
    • ►  06/29 - 07/06 (2)